Final striping work prompts rolling lane closures on Silverbell - Tucson News Now

Final striping work prompts rolling lane closures on Silverbell Road

TUCSON, AZ (Tucson News Now) -

Construction kicks off on Silverbell Road again this week, while crews perform final striping work after a long term widening project.

This work will last from 6 a.m. to 6 p.m. Monday, September 28 through Wednesday, September 30. Crews will install thermal, reflective striping here.

Rolling lane closures will take place while this project plays out, so west side drivers should be aware, and therefore slow down in the area.

This schedule could change based on weather conditions.

Copyright 2015 Tucson News Now. All rights reserved. 

Powered by Frankly